HAL imposes ‘contractual penalties’ on GE for Tejas engine delivery delay;

Hindustan Aeronautics Limited anticipates receiving 20 F404 engines from General Electric by December, with a sixth for the Tejas Mark 1A expected by April-end. HAL is imposing contractual penalties on GE for engine supply delays. Meanwhile, all 34 Tejas jets are set to resume flying from April 8 after software issues were resolved, following a recent grounding incident.

from Times of India https://ift.tt/zwCaThI
via IFTTT

Comments

Popular posts from this blog

Furore in IIT-Bombay over talks on Hamas, Hinduism

HC: Treat arrest, even without exchange of fire, as encounter